国产一级淫一区二区波多野结衣_日韩无码免费一级片_国产日韩欧美主播视频在线播放_乱伦无码免费综合_成全视频高清免费观看_国产三级成人第一_久久亚洲aⅴ永久无码精品_电影免费在线观看日本_人妻内谢精中文字幕_天堂亚洲欧美在线中文

Contact Us

Cross Flow Fan Installation and maintenance requirements

Date: 2016-5-13   Click: 1531 Times

1, "Cross Flow Fan" ambient temperature should be 75ºC ≥ -40ºC.
2, industrial gas through the cooling fan does not allow strong acid, alkali and various solutions.
3, does not allow dust and other debris fall into the fan, so as to avoid burning and fan blades break.
4, "Cross Flow Fan" before installation should first check whether the damage caused due to packing and shipping, deformation, if damaged or deformed should be repaired after installation.
5, and then check the "Cross Flow Fan" all parts and screws are loose; whether touching or displacement between the blade and duct before installation if the touching or the shift should be adjusted. To replace the fan products from different manufacturers, you need to measure fan site size holes.

Back to: Industry news

+86-0769-83660708

Home Product News Contact