国产一级淫一区二区波多野结衣_日韩无码免费一级片_国产日韩欧美主播视频在线播放_乱伦无码免费综合_成全视频高清免费观看_国产三级成人第一_久久亚洲aⅴ永久无码精品_电影免费在线观看日本_人妻内谢精中文字幕_天堂亚洲欧美在线中文

Contact Us

Inflatable Air Blower cleaning process

Date: 2015-1-5   Click: 1331 Times

Finishing "Inflatable Air Blower" must pay attention to the fan power cord and clip the button, the line to be sorted out in advance, do not let the fan run when working on the line to produce a variety of contact, the power cord is in the initial position of the fan in general (both removed available).
Adjust the position of the radiator
The radiator tune in the right place, the place "Inflatable Air Blower" level to the processor port cover side, four point deduction buckle clasp around the column (beak antennae) in the bottom of the need to align with the motherboard. The radiator tune into the right position, the fan will be placed horizontally to cover the processor port side, the four point deduction buckle clasp around the column (beak antennae) in the bottom of the need to align with the motherboard. Motherboard Intel processor buckle hole distribution in the vicinity of the CPU socket, the user can easily observe the board found. Intel original radiator have to look at before installing rotary switch is fully restored in situ. "Inflatable Air Blower" As a result of the heat sink clip clip pressed four buckle design, so the best way is to install the clip "diagonal" push installation method. Order push uneven force likely to cause the fan, causing the other two buckle pressing difficulties.

Back to: Industry news

+86-0769-83660708

Home Product News Contact